4.3 GANTT
It is a matrix which activities can be located, with a specific and scheduled time to do the work and also a responsible of that activity. Is used to program activities, monitoring a project, determine progress, assign responsibilities and is widely used as a schedule of activities.
The diagram is composed of a vertical shaft where are shown activities that constitute the job to be executed, and a horizontal axis showing a calendar duration each one of them.